Goldwind’s first GW165-5.2MW wind turbine connected to grid
The date of:
2021-09-06
viewed:
2
Chinese manufacturer announces successful connection to the grid of its first GW165-5.2MW turbine launched last yearDesigned for medium- to high-wind speed sites and launched in October 2020 alongside the GW165-3.6/4.0MW, it marks what the manufacturer describes as the “beginning of [its] land-based large megawatt turbines.”The turbines feature a permanent-magnet generator and will be made available in flexible power ratings, with a range of different rotor diameters, hub sizes, tower structures and blade lengths. The longest blade will be 80.8 metres.
Hot News
/
Related to recommend
2024
-
03
-
26
Click on the number of times:
0
source:resource worldE-Tech Resources Inc. [TSXV-REE; FSE-K2I] reported the successful completion of its trenching and sampling program at the Eureka project in Namibia. The program revealed significa...
2024
-
03
-
25
Click on the number of times:
0
source:phys.orgCerium is a rare Earth metal that has numerous technological applications, for example, in some types of lightbulbs and flat-screen TVs. While the element is rare in Earth's crust, ...
2024
-
03
-
22
Click on the number of times:
0
source:wvnstvATHENS, WV (WVNS) — Concord University reached a milestone with the installation of a high-performance X-ray-diffracting crystal at the Rare Earth Element Analysis Center.The high-perform...
2024
-
03
-
21
Click on the number of times:
0
source:Innovation news networkAn international group of scientists have used theoretical predictions to fabricate a new rare earth catalyst that helps the oxygen evolution reaction.A group of research...