Goldwind’s first GW165-5.2MW wind turbine connected to grid
The date of:
2021-09-06
viewed:
15
Chinese manufacturer announces successful connection to the grid of its first GW165-5.2MW turbine launched last yearDesigned for medium- to high-wind speed sites and launched in October 2020 alongside the GW165-3.6/4.0MW, it marks what the manufacturer describes as the “beginning of [its] land-based large megawatt turbines.”The turbines feature a permanent-magnet generator and will be made available in flexible power ratings, with a range of different rotor diameters, hub sizes, tower structures and blade lengths. The longest blade will be 80.8 metres.
Hot News
/
Related to recommend
2026
-
04
-
17
Click on the number of times:
1
来源:ACS PublicationsThe optical performance of persistent phosphors like SrAl2O4:Eu2+,Dy3+ is limited due to environmental sensitivity. We fabricated a multifunctional phosphor–glass composite in which...
2026
-
04
-
16
Click on the number of times:
0
来源:ACS PublicationsThree phases of stoichiometric europium(III) iodate compounds are probed as candidates for optical quantum memory to determine the impact of reaction conditions on phase formation a...
2026
-
04
-
16
Click on the number of times:
1
Pentagonal Bipyramidal Dy(III) Ions Bridged by Homologous Metallocyanate Anions into One-Dimensional Chain Structures Exhibiting Distinct Magnetic Relaxation Properties来源:ACS PublicationsThe continuou...
2026
-
04
-
15
Click on the number of times:
1
来源:ACS PublicationsUp to date, the development of highly efficient, visible light-active catalysts remains a formidable challenge due to the enhanced rising of atmospheric CO2 concentration. This stud...