Goldwind’s first GW165-5.2MW wind turbine connected to grid
The date of:
2021-09-06
viewed:
2
Chinese manufacturer announces successful connection to the grid of its first GW165-5.2MW turbine launched last yearDesigned for medium- to high-wind speed sites and launched in October 2020 alongside the GW165-3.6/4.0MW, it marks what the manufacturer describes as the “beginning of [its] land-based large megawatt turbines.”The turbines feature a permanent-magnet generator and will be made available in flexible power ratings, with a range of different rotor diameters, hub sizes, tower structures and blade lengths. The longest blade will be 80.8 metres.
Hot News
/
Related to recommend
2025
-
10
-
23
Click on the number of times:
1
来源:彭博新闻社Rare earths shares jumped in Sydney after President Donald Trump signed an agreement with Australian Prime Minister Anthony Albanese that’s been described as a “shot in the arm” for the indust...
2025
-
10
-
16
Click on the number of times:
0
来源 :ACS PublicationsMagnetic refrigeration using the magnetocaloric effect (MCE), where the temperature of a material changes as a magnetic field is applied, is a promising technology to increase the ...
2025
-
10
-
15
Click on the number of times:
1
来源:ACS PublicationsSelective and eco-friendly separation and purification methods for rare earth elements (REEs) are necessary to meet the increasing demand for these valuable metals, which are extens...
2025
-
10
-
14
Click on the number of times:
1
Exploring Spin Hall Conductivity and Tunable Magnetoresistance in the Rare-Earth Topological Antiferromagnetic Dirac Semimetal GdCuSn 来源:ACS PublicationsMagnetic topological materials, driven by their...