Goldwind’s first GW165-5.2MW wind turbine connected to grid
The date of:
2021-09-06
viewed:
2
Chinese manufacturer announces successful connection to the grid of its first GW165-5.2MW turbine launched last yearDesigned for medium- to high-wind speed sites and launched in October 2020 alongside the GW165-3.6/4.0MW, it marks what the manufacturer describes as the “beginning of [its] land-based large megawatt turbines.”The turbines feature a permanent-magnet generator and will be made available in flexible power ratings, with a range of different rotor diameters, hub sizes, tower structures and blade lengths. The longest blade will be 80.8 metres.
Hot News
/
Related to recommend
2025
-
09
-
05
Click on the number of times:
1
Controlling Magnetic Anisotropy of Endohedral Lanthanide Ions by Carbene Addition Paramagnetic NMR, Lanthanide Luminescence, and Single-Molecule Magnetism in Adamantylidene Adducts of MSc2N@C80 (M = N...
2025
-
09
-
03
Click on the number of times:
1
Concentration-Quenching-Suppressed Eu3+-Activated Ba3Lu2B6O15 Orange-Red-Emitting Phosphors via One-Dimensional Structural Confinement for Thermally Stable White LEDs 来源:ACS PublicationsConventio...
2025
-
09
-
02
Click on the number of times:
1
Modulating Electrochemical Performance of La2FeNiO6/MWCNT Nanocomposites for Hydrogen Storage Inquiries: Schiff-Base Ligand-Assisted Synthesis and Characterization来源:ACS PublicationsSince the role of ...
2025
-
09
-
01
Click on the number of times:
1
来源:ACS PublicationsThe reaction of [LnIII(OArP-κ2O,P)3] (1-Ln, Ln = La, Sm, Y, Yb, and ArPO– = 2,4-tBu2-6-(Ph2P)C6H2O–) with the copper(I) triflate toluene adduct yields the corresponding dinuclear ra...