News News
Contact us
  • Customer service number:64321087
  • Commercial service telephone:13918059423
  • Technical service telephone:13918059423
  • Contact person: Mr. Cui 
  • Service email:shxtb@163.com
  • Address: room 107, building 8, no. 100, guilin road, xuhui district, Shanghai

RareX to begin drilling Cummins Range rare earths project to test revised geological model

The date of: 2021-04-07
viewed: 14

source:Small Caps

After a thorough review, RareX (ASX: REE) will begin a major drilling program later this month, which is designed to test a new geological model at its flagship Cummins Range rare earth element project in Western Australia’s Kimberly.

The upcoming program will comprise up to 6,000m of reverse circulation and diamond drilling and will follow up on newly identified targets.

RareX geologists undertook a “thorough” review of the project including analysing data from 58 RC holes that were completed in August through to October last year.

The review has led to the development of a new geological model for Cummins Range and “significant” exploration targets.

This revised model has underpinned planning for the upcoming program.

RareX managing director Jeremy Robinson said the company’s geological team’s new understanding of Cummins Range could be a “game-changer” and builds on its existing attributes as an “advanced, high-quality” REE project.

“If the new geological interpretation is confirmed, the upcoming drilling has the potential to dramatically expand the scale of the deposit and delineate a significant volume of new high-grade material,” he added.

April exploration re-start

RareX has already secured drill contractors for the program that will start towards the end of this month.

The company has also begun mobilisation of the camp.

About 10 holes for 2,000-3,000m of diamond drilling has been planned to test down-dip extensions to the main fault, which has been identified over 550m of strike. Holes will be drilled to depths ranging from 150m to 400m.

Another 2,000-3,000m of RC drilling will target extensions to the main fault along with other anomalies.

This information is expected assist with upgrading the current inferred resource of 13 million tonnes at 1.13% total rare earth oxides with 22.1% neodymium-praseodymium.

As well as mineral exploration, several holes will be drilled to feed into mining study work.

These will include three diamond holes to obtain geotechnical information for pit designs and further metallurgical samples.

In line with pre-mining requirements, six water monitoring bores will be completed to gather information on water movement and impacts on local and regional environments.



Hot News / Related to recommend
  • 2025 - 04 - 03
    Click on the number of times: 0
    Synthesis of Mixed Anion Rare Earth Sulfate Fluorides LnSO4F·H2O (Ln = Nd, Tb, Dy, and Ho) and LnSO4F (Ln = Tb, Dy, and Ho) source:ACSPublicationSingle crystals of the mixed anion rare earth...
  • 2025 - 04 - 02
    Click on the number of times: 0
    source:SMALL CAPSAlligator Energy (ASX: AGE) has identified multiple uranium anomalies and some rare earth potential in analysis of results from its 2024 exploration program in the Alligator Rivers ur...
  • 2025 - 04 - 01
    Click on the number of times: 0
    source:Hebrew University of JerusalemResearchers have discovered an unexpected superconducting transition in extremely thin films of niobium diselenide (NbSe2). Publishing in Nature Communications, th...
  • 2025 - 03 - 31
    Click on the number of times: 0
    source:resourceworldBrazilian Rare Earths Limited [ASX: BRE] reported results of exploration drilling at the Pelé Target 1 Project, located in Bahia, Brazil.The Pelé Project is hosted within...
  • Copyright ©Copyright 2018 2020 Shanghai rare earth association All Rights Reserved Shanghai ICP NO.2020034223
    the host:Shanghai Association of Rare Earth the guide:Shanghai Development and Application Office of Rare Earth the organizer:Shanghai rare earth industry promotion center
    犀牛云提供云计算服务